Two concepts in Odoo ERP v10 MRP under maintenance – Work Centers and Machines & Tools Odoo ERP v10 MRP under maintenance – Work Centers and Machines & Tools We have two concepts in Odoo under maintenance – Work Centers (a place where production is done) And Machines Tools (individually... ERP MRP odoo10 Odoo 10
Newly Introduced feature in Odoo ERP v10 MRP – Scheduling Work Orders Newly Introduced feature in Odoo MRP odoo 10 – Scheduling Work Orders There are 2 aspects of MRP II – Planning Scheduling. Newly introduced work orders scheduling based on capacity planning. Two step ... ERP Feature MRP odoo10 Odoo 10
In Odoo ERP v10 MRP operation hours are based on average and standard deviations In MRP Odoo10 operation hours are based on average and standard deviations Clocking every operation manually is still prevalent to this day. It hasn’t evolved with the process. What Odoo MRP10 has com... ERP MRP odoo10 Odoo 10
Master Production Schedule (MPS) is the master of all schedules in Odoo ERP v10 MRP Master Production Schedule is the master of all schedules in MRP Odoo10 To automate scheduling, along with existing Minimum Stock Rules and Make-to-Order newly added MPS (Master Production Schedule) w... ERP MPS odoo10 Odoo 10